Stockcholm AVN 800 2*60 mtr mix ground,7,7% slope uphill

Kategorie News

17.11.2016-Preparing for two sections with a machine 800mm in diameter 60 meters in height over 7%.

29.11.2016Start the drill.

02.12.2016-End of drive One .

07.12.2016-Start of drive number two .

10.12.2016-End of drive two and close the project .