News

19.09.2016–Start shuttering works, preparation and lowering,chamber rings  for pipe jacking system .Rings in  diameter of  3,2mtr and 4,5mtr. 28.09.2016–End of the work associated with the deposition of the Rings, for the starting chamber and the receiving chamber for pipe jacking .

06.03.2016–We would like to inform you that we are starting 90 meter tunnel with an outside diameter of 1800 under the River Nissan in Halmstad -Sweden for BAB Rortryckning. 12.03.2016–Today we finished the tunnel as soon as possible by going through the wooden piles . Along with the setup, drilling , packaging equipment we were able to do it in no more than a month . ” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]

01.10.2015— We are pleased to inform  that, from the month of October, our TEAM participates in the project in Sweden-citi of Stockholm , with a diameter of 1200 mm machine that performs lenght of about 150 meters which will drill through 15.02.2016—On this day  we ended so unexpectedly hard drive in granite , where our team mentioned 90 cutting discs and many other cutting tools, total underground time spent more than 350 man-hours. ” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]

01.10.2015— We are pleased to inform  that, from the month of October, our TEAM participates in the project in Sweden-citi of Stockholm, with a diameter of 1200 mm machine that performs lenght of about 150 meters which will drill through solid rock. 15.02.2016—On this day  we ended so unexpectedly hard drive in granite , where our team mentioned 90 cutting discs and many other cutting tools, total underground time spent more than 250 man-hours. 06.03.2016–We would like to inform you that we are starting 90 meter tunnel…Kontynuuj Czytanie “News”

 

We would like to present you our offer the goal of which is to minimize costs borne by an average company engaged in microtunneling and thus to improve on its financial situation and project planning regarding predictability of finishing respective parts of a project.
We offer you:
Teams specialized in works using Herrenknecht drilling machines.
AVN machines operators
Excavator operators
Plumbers for operating AVN machine systems
A staff for operating separators like Bauer, ITE, Brandt Cobra, Schaumburg, etc.
Welders, gas cutter operators
Electricians for possible repairs and AVN servicing
Oil pumbers
Our staff is self-sufficient. Except a surveyor and a supervisor, we do not need anything from a customer to perform works efficiently and unobstructed.
We help with meeting deadlines on recently started as well as ongoing constructions. We are able to speed up rate of works without engaging more people than it is necessary and, what is the most important, we do it properly and with a precision corresponding our experience in this field.
To sum up:
If your current project is struggling delays
If your current or future construction requires additional time
If your company needs support
Do not hesitate and choose “Contact” tab, call us or write to us and for sure we will help you to meet your requirements.