19.09.2016–Start shuttering works, preparation and lowering,chamber rings  for pipe jacking system .Rings in  diameter of  3,2mtr and 4,5mtr. 28.09.2016–End of the work associated with the deposition of the Rings, for the starting chamber and the receiving chamber for pipe jacking .